GEMTEC undertook a geotechnical investigation for a new bridge, replacing the multi-span timber-frame bridge over the Cocagne River.
Project highlights include:
- Land-based and barge-drilled borehole investigation
- Conventional boreholes and seismic CPT soundings
- Design recommendations for the approach embankments and pier foundations
- Dynamic pile testing using a Pile Driving Analyzer (PDA)